The gas transmission system operators publish their Gas Network Development Plan 2013

The German gas transmission system operators (TSOs) will invest around €2.2 billion over the period before 2023 in the expansion of the national gas infrastructure. "This shows that German transmission system operators are deeply committed to security of supply," said Inga Posch, Managing Director of the Association of Gas Transmission System Operators Gas (FNB Gas). The second national Gas Network Development Plan (Gas NDP) published today lists a total of 27 TSO projects confirmed by BNetzA for the next ten years, which will increase the installed compressor capacity in Germany by a total of 344 megawatts and add some 522 kilometres of new high-pressure pipelines to the gas infrastructure.

mehr lesen

"A particular challenge we will have to overcome is the decline in domestic L-gas production," Posch added. This is aggravated by the fact that L-gas imports from the Netherlands will also decline sharply over the coming years. As a possible strategy to ensure the long-term security of gas supplies in Germany and Europe, the NDP 2013 is therefore, for the first time, looking at the conversion of L-gas market areas to H-gas. "With the NDP 2013, we are starting a comprehensive public discussion process with market partners and the regulatory authority about the measures to be taken," Posch continued. The framework for the NDP 2013 was defined in close cooperation with the Federal Network Agency and market players such as gas traders and operators of power plants and storage facilities. The focus here was on ensuring continuity in the planning and expansion of the gas transmission networks as part of the energy system transformation. This included, in particular, BNetzA's change request dated 18 December 2013, which led to additional measures being incorporated into the NDP 2013.

Downloads anzeigen     +

  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmen gemäß Änderungsverlangen der BNetzA vom 18.12.2013
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Inputliste Modellierung
    Download / 1.16MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Kraftwerksprodukt - Zuordnung Kraftwerke
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Lastflusszusagen
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umsetzungsstand NEP 2012
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umstellgebiete L-Gas
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Unterbrechungsliste
    Download / 0.18MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenliste Varianten H-Gas-Versorgungssicherheit
    Download / 0.23MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenübersicht
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Kosten-Nutzen-Analyse
    Download / 1.12MB / PDF
  • Stellungnahmen zum Netzentwicklungsplan Gas 2013
    Download / 11.05MB / ZIP
  • PDF Pressemitteilung: Veröffentlichung Netzentwicklungsplan Gas 2013 vom 18.03.2014
    Download / 0.23MB / PDF

Überarbeitung

18.12.2013

Federal Network Agency submits change requests to gas transmission system operators

The Federal Network Agency today completed the process of preparing the Gas NDP 2013 and submitted a change request to the gas transmission system operators.

Konsultation

24.04.2013

Federal Network Agency initiates consultation on the draft Gas Network Development Plan 2013

Federal Network Agency concludes procedure for the preparation of the Gas Network Development Plan 2013


mehr lesen

Entwurf

01.04.2013

Gas transmission system operators publish the draft of the second Germany-wide Gas Network Development Plan 2013

On 1 April 2013, the German gas transmission system operators (TSOs) submitted their draft of the Gas Network Development Plan 2013 (Gas NDP 2013) to the Federal Network Agency (BNetzA). It is based on the Scenario Framework confirmed by BNetzA, which the TSOs presented in October 2012. Both the development of the Scenario Framework and the draft Gas NDP 2013 now available were preceded by intensive consultations which saw numerous market players submitting comments.

mehr lesen

The main focus of the Gas NDP 2013, which sets out different gas network modelling variants for the years 2013 to 2023, are specific network expansion projects and associated costs. The gas TSOs and the market players involved in the consultation process are looking to achieve the optimum level of costs and benefits. A comprehensive comparison of the different modelling variants shows clear economic advantages for the capacity products for gas-fired power plants and gas storage facilities. "With this jointly developed modelling variant, which involves investments of around €1.6 billion, we are creating the conditions for a high level of supply security and flexibility for future gas trading," said Ralph Bahke, Chairman of the newly-founded Association of Gas Transmission System Operators (FNB Gas). According to the calculations made as part of the NDP 2013, a network expansion that creates freely allocable capacities for new gas storage facilities as well as new and system-relevant power plants would double the additional costs to the economy as a whole. "Above all, the energy transition must remain affordable. This calls for intelligent capacity products instead of steel," Bahke continued. 

Decline in L-gas production / imports 

Another issue that will be a major challenge for gas network operators is already on the horizon: the switch from L-gas to H-gas, which is necessary because of the decline in L-gas production. The sharp drop in export capacities to Germany announced by the Netherlands requires a quick response from the gas TSOs. As early as 2023, import volumes are expected to be 30 percent lower than in 2020, and from 2030 onwards, L-gas imports from the Netherlands are expected to come to a complete standstill. In addition, the production of L‑gas in Germany is also declining. This is why investments in market area conversion programmes and conversion plants must be made now.

Downloads anzeigen     +

  • Entwurf Netzentwicklungsplan Gas 2013
    Download / 23.78MB / PDF
  • Anlage zum Netzentwicklungsplan Gas 2013: Inputliste Modellierung
    Download / 1.14MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Kraftwerksprodukt - Zuordnung Kraftwerke
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Lastflusszusagen
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umsetzungsstand NEP 2012
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umstellgebiete L-Gas
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Unterbrechungsliste
    Download / 0.18MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenliste Varianten H-Gas-Versorgungssicherheit
    Download / 0.23MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenübersicht
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Kosten-Nutzen-Analyse
    Download / 1.12MB / PDF
  • Stellungnahmen zum Netzentwicklungsplan Gas 2013
    Download / 11.05MB / ZIP
  • PDF Pressemitteilung: Energiewende muss bezahlbar bleiben vom 02.04.2013
    Download / 0.49MB / PDF
  • PDF Press Release in English dated 02.04.2013
    Download / 0.49MB / PDF

Konsultation

28.02.2013

Consultation workshop held

Following the publication of the draft NDP 2013, the gas transmission system operators held a consultation workshop.

Downloads anzeigen     +

  • Workshop Netzentwicklungsplan Gas 2013: Agenda
    Download / 0.3MB / PDF
  • Workshop Netzentwicklungsplan Gas 2013: Einführung L-Gas
    Download / 1.71MB / PDF
  • Workshop Netzentwicklungsplan Gas 2013: Quellenverteilung H-Gas
    Download / 2.26MB / PDF
  • Workshop Netzentwicklungsplan Gas 2013: Modellierungsergebnisse
    Download / 2.16MB / PDF
  • Workshop Netzentwicklungsplan Gas 2013: Temperaturabhängig feste Kapazität an Speichern (TaK)
    Download / 0.78MB / PDF
  • Workshop Netzentwicklungsplan 2013: Kraftwerksprodukt (Feste Kapazität mit Zuordnungsauflage im Unterbrechungsfall)
    Download / 0.34MB / PDF
  • Abänderungen im Szenariorahmen und Zeitplan BNetzA zum Netzentwicklungsplan Gas 2013
    Download / 0.42MB / PDF
  • Vorläufige Ergebnisse der Kosten-Nutzen-Analysen zum Netzentwicklungsplan Gas 2013
    Download / 1.11MB / PDF

Konsultation

18.02.2013

Consultation document for the second Germany-wide Gas Network Development Plan 2013 published

This document is based on the Scenario Framework confirmed by the Federal Network Agency (BNetzA) after market consultation by the gas TSOs on 18 October 2012.

Downloads anzeigen     +

  • Konsultationsdokument Netzentwicklungsplan Gas 2013
    Download / 23.65MB / PDF
  • Anlage zum Netzentwicklungsplan Gas 2013: Inputliste Modellierung
    Download / 1.14MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Kraftwerksprodukt - Zuordnung Kraftwerke
    Download / 0.06MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Lastflusszusagen
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umsetzungsstand NEP 2012
    Download / 0.07MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Umstellgebiete L-Gas
    Download / 0.08MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Unterbrechungsliste
    Download / 0.19MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenliste Varianten | H-Gas-Versorgungssicherheit
    Download / 0.18MB / XLS
  • Anlage zum Netzentwicklungsplan Gas 2013: Maßnahmenübersicht
    Download / 0.07MB / XLS

Workshop

23.01.2013

Workshop invitation

This workshop on 28 February 2013, on the occasion of the publication of the draft Gas Network Development Plan 2013 is intended to continue the dialogue with market players. The gas transmission system operators want to give you the opportunity to discuss your questions about the Network Development Plan and to contribute your suggestions. Further information about the workshop will be provided in due time. 

Downloads anzeigen     +

  • Einladung zum begleitenden Workshop anlässlich der Konsultation des Netzentwicklungsplanes Gas 2013
    Download / 0.1MB / PDF

Diese Website verwendet Cookies, um Ihr Benutzererlebnis zu verbessern. Mehr erfahren

Ok, Verstanden